GRAF Australia
763 m³ stepped OSD beneath sloped Burleigh carpark project photo, Burleigh Heads, QLD
StormwaterCommercialStormwater detention/retention EcoBloc

763 m³ stepped OSD beneath sloped Burleigh carpark

EcoBloc engineered to follow site grade with full trafficable loading.

Hutchinson Builders / Farr Engineers · Burleigh Heads, QLD

763 m³

Detention volume

Stepped

Grade-following design

Trafficable

Carpark loading

Project data

Location
Beneath carpark
Region
Australia
Sector
Commercial
Solution
Stormwater detention/retention
Product
EcoBloc
Source
GRAF Australia
Purpose
Onsite stormwater detention
Volume
763 m³
Contractor
Reece Civil Nerang
01

Challenge

The Verge Retirement Village needed 763 m³ OSD beneath a sloped carpark with minimal cover and an irregular footprint that a flat concrete tank could not follow.

02

Solution

GRAF stormwater engineers designed a stepped EcoBloc system using the full available footprint. Reece Civil Nerang delivered holistic supply and welded installation.

03

Outcomes

  • 763 m³ fully trafficable detention
  • Stepped design follows site grade
  • Cost and time saving versus concrete