WastewaterIndustrialWastewater treatment Klaro
600-staff wastewater plant for Canterbury meat processor
New onsite treatment when original plant failed consent conditions.
Canterbury meat processing plant · Canterbury, NZ
600 staff
Workforce served
Consent
Compliance restored
Industrial
Site type
Project data
- Location
- Canterbury, NZ
- Region
- New Zealand
- Sector
- Industrial
- Solution
- Wastewater treatment
- Product
- Klaro
- Source
- KLARO
- Purpose
- Industrial wastewater
- Capacity
- 600 staff
01
Challenge
A large meat processing plant with approximately 600 staff needed a new onsite wastewater plant when the original system no longer met consent conditions.
02
Solution
GRAF with local preferred wastewater contractors supplied a treatment plant sized for administration offices and operations across the full workforce.
03
Outcomes
- Sized for 600 staff across offices and operations
- Consent-compliant replacement system
- Engineered for industrial site loads