GRAF Australia
9mɜ/day project photo
Rainwater

9mɜ/day

9mɜ/day

System size

9000l per day

Application

Rainwater

Project photos

8

The Challenge

Due to the growing local tourism and the desire to explore the abundant walking trails in the Lakes District the client has designed an ecofriendly establishment to cater hikers, back packers and adventurers. The Blackthorn Lodge comprises of huts for accommodation and a communal building. The Blackthorn Lodge comprises of 14 x Huts (Two of which are self- contained) and One Ancillary Building (communal kitchen, ablutions, laundry, and communal area). The Huts will provide accommodation for up to 50 guests with flow allowance of 150 litres/person/day. The Ancillary Building will provide, Kitchen facilities, Lounge/dining areas, Laundry and Showers Wastewater Treatment Plant Case Study: Accommodation, Glenorchy 9mɜ/day

Project Data Installation Date December 2020 Purpose Commercial Wastewater Treatment Wastewater Production Domestic Waste and Commercial Kitchen Final Designation Commercial Design Engineer GWE Engineering Installation Contractor Water Projects Time to Install 4 days Size 9000l per day UV Yes Disposal Compensated Drippers in sand and protected by Graf Ecosmart blocs Disposal Field Size 182 m2 Telemetry Yes Phosphorus Dosing Yes Carbon Dosing Yes

Project Data

Installation Date
December 2020
Purpose
Commercial Wastewater Treatment
Final Designation
Commercial
Design Engineer
GWE Engineering
Installation Contractor
Water Projects
Time to Install
4 days
Size
9000l per day