Project Overview
EcoBloc on site Stormwater Infiltration Newman Catholic College JCU Cairns Campus 150m3 Bryant Building Contractors were awarded the construction of Newman Catholic College. The project includes construction of the new Catholic College within the James Cook University, Smithfield. The college will accommodate 125 year 7 students in 2020 and over the next few years will progressively reach year 12 by 2027. It is a master planned college that will be built in four stages over a 10-year period. The project required 150m3 of infiltration tank volume to manage the additional stormwater calculated from the new building roofs and car parks. Installation Date 04/05/2021 Purpose On site Stormwater Infiltration Time to Install 2 Days Size 150m3 Dimensions 24.0m x 7.2m x 1.0m Ground Cover 500mm Final Designation Newman Catholic College, Cairns Inspectable 1x Inspection shaft with Class D Cover Installation Contractor HPS Contractors Design Engineer Civil Walker Consulting Engineers Project Data:
Project Data
- Installation Date
- 04/05/2021
- Purpose
- On site Stormwater Infiltration
- Time to Install
- 2 Days
- Size
- 150m3
- Dimensions
- 24.0m x 7.2m x 1.0m
- Ground Cover
- 500mm
- Final Designation
- Newman Catholic College, Cairns
- Inspectable
- 1x Inspection shaft with Class D Cover
- Installation Contractor
- HPS Contractors
- Design Engineer
- Civil Walker Consulting Engineers