150 m³ infiltration for Newman Catholic College, Cairns project photo, Cairns, QLD
StormwaterMining/campsInfiltration EcoBloc

150 m³ infiltration for Newman Catholic College, Cairns

EcoBloc under JCU campus with 500 mm cover and Class D inspection shaft.

Bryant Building Contractors · Cairns, QLD

150 m³

Infiltration volume

2 days

Install time

500 mm

Cover depth

Project data

Location
Cairns, QLD
Region
Australia
Sector
Mining/camps
Solution
Infiltration
Product
EcoBloc
Source
GRAF Australia
Purpose
Onsite infiltration
Volume
150 m³
Dimensions
24 m × 7.2 m × 1.0 m
Engineer
Civil Walker Consulting
01

Challenge

Newman Catholic College within James Cook University Smithfield campus needed onsite stormwater infiltration beneath the college footprint with inspectable access.

02

Solution

GRAF supplied 150 m³ EcoBloc infiltration across a 24 m × 7.2 m footprint with one inspection shaft and Class D cover. HPS Contractors installed in two days.

03

Outcomes

  • 150 m³ infiltration in two days
  • 500 mm cover with Class D inspection
  • Master-planned college campus integration