EcoBloc on site Stormwater

Infiltration

System size

150m³

Application

Stormwater

Project photos

9

Project Overview

EcoBloc on site Stormwater Infiltration Newman Catholic College JCU Cairns Campus 150m3 Bryant Building Contractors were awarded the construction of Newman Catholic College. The project includes construction of the new Catholic College within the James Cook University, Smithfield. The college will accommodate 125 year 7 students in 2020 and over the next few years will progressively reach year 12 by 2027. It is a master planned college that will be built in four stages over a 10-year period. The project required 150m3 of infiltration tank volume to manage the additional stormwater calculated from the new building roofs and car parks. Installation Date 04/05/2021 Purpose On site Stormwater Infiltration Time to Install 2 Days Size 150m3 Dimensions 24.0m x 7.2m x 1.0m Ground Cover 500mm Final Designation Newman Catholic College, Cairns Inspectable 1x Inspection shaft with Class D Cover Installation Contractor HPS Contractors Design Engineer Civil Walker Consulting Engineers Project Data:

Project Data

Installation Date
04/05/2021
Purpose
On site Stormwater Infiltration
Time to Install
2 Days
Size
150m3
Dimensions
24.0m x 7.2m x 1.0m
Ground Cover
500mm
Final Designation
Newman Catholic College, Cairns
Inspectable
1x Inspection shaft with Class D Cover
Installation Contractor
HPS Contractors
Design Engineer
Civil Walker Consulting Engineers