StormwaterMining/campsInfiltration EcoBloc
150 m³ infiltration for Newman Catholic College, Cairns
EcoBloc under JCU campus with 500 mm cover and Class D inspection shaft.
Bryant Building Contractors · Cairns, QLD
150 m³
Infiltration volume
2 days
Install time
500 mm
Cover depth
Project data
- Location
- Cairns, QLD
- Region
- Australia
- Sector
- Mining/camps
- Solution
- Infiltration
- Product
- EcoBloc
- Source
- GRAF Australia
- Purpose
- Onsite infiltration
- Volume
- 150 m³
- Dimensions
- 24 m × 7.2 m × 1.0 m
- Engineer
- Civil Walker Consulting
01
Challenge
Newman Catholic College within James Cook University Smithfield campus needed onsite stormwater infiltration beneath the college footprint with inspectable access.
02
Solution
GRAF supplied 150 m³ EcoBloc infiltration across a 24 m × 7.2 m footprint with one inspection shaft and Class D cover. HPS Contractors installed in two days.
03
Outcomes
- 150 m³ infiltration in two days
- 500 mm cover with Class D inspection
- Master-planned college campus integration