763 m³ OSD beneath a sloped carpark at The Verge project photo, Burleigh Heads, QLD
StormwaterCommercialStormwater detention/retention EcoBloc SMART

763 m³ OSD beneath a sloped carpark at The Verge

Stepped EcoBloc with 25-year warranty, RPEQ and Form 15 certification.

Hutchinson Builders / Farr Engineers · Burleigh Heads, QLD

763 m³

Detention volume

25-year

Warranty

RPEQ

Certified design

Project data

Location
Burleigh Heads, QLD
Region
Australia
Sector
Commercial
Solution
Stormwater detention/retention
Product
EcoBloc SMART
Source
GRAF Australia
Purpose
Onsite stormwater detention
Volume
763 m³
Engineer
Farr Engineers
01

Challenge

The Verge Retirement Village needed 763 m³ OSD beneath a carpark with minimal cover, irregular footprint, 25-year warranty and ongoing maintenance partners in place.

02

Solution

GRAF designed stepped EcoBloc SMART with RPEQ and Form 15 certification. Reece Civil Nerang delivered holistic supply with maintenance plans and certified partners.

03

Outcomes

  • 763 m³ with 25-year product warranty
  • RPEQ and Form 15 certified design
  • Maintenance partners for ongoing service