
Salter Point
Salter Point
System size
450m³
Application
Stormwater
Project photos
1
Project Overview
CASE STUDY Salter Point ENGINEER: BG & E PRODUCT: EcoBloc Flex and EcoBLoc Maxx infiltration systems INSTALLATION PLUMBER: Impulse Plumbing Recently Graf installed a combination of EcoBloc Flex and EcoBloc Maxx infiltratio n systems. The choice to do a combination of tanks with built in shafts allows for easy inspection and cleaning. The project required the use of three infiltration tanks which has a total storage capacity of 450m3 Overview PROJECT OVERVIEW The Solution To save space during transport, two EcoBloc Inspect modules are stacked one inside th e other. This halves transport costs and C O2 emissions. GRAF EcoBloc Inspect modu les are easy to transport and install. The mod ular system structure requires only a few a ccessories. The standard inspection channel allows the entire infiltration system to b e effectively monitored. The ability of t he EcoBloc Inspect system allow access by inspection cameras that are comm only found on the market. This has been confirmed, by several indep endent testing authorities. The s tandard inspection channel allows th e entire infiltration system to be effectively monitored. Each EcoBloc Inspect module has a volume of 205 l, a area of 800x 800 m m and a height of 320 mm. The system si ze and loadbearing can be adjus ted individually to suit requirements of traffic and of non-traffic area.
Project Gallery
Planning something similar?
Salter Point