Project Overview

CASE STUDY Truck Centre, WA Forestfield Truck Center (WA) is the result of an amalagamtion between Truck World an d Max Winkless, bringing the Mack Truc ks and Volvo brands together with the construction of a new purpose bult t ruck facility in the metropolitan area located in Forrestfield. Intertia Engineering assisted RSA on the design of a 400m access road an d internal depot design that will link t he truck centre to the industrial park. The projected Stormwater Management Plan calculated a 60KL Stormwater tan k was necessary to store the stormwate r from the roof of the new facility and hardstand. Overview DESIGN ENGINEER: Civil Walker Consulting Engineers PRODUCT: 3x Platin XXL 20kL Stormwater Tanks INSTALLATION CONTRACTOR: Inertia Engineering for RSA Consulting PROJECT OVERVIEW

Graf worked with Reece Civil at Canning Vale to offer BGC Plumbing the 60kL Onsite Stormwater tank specified in the project Development Application plans, by using 3x interconnected 20kL Platin XXL tanks held locally in stock. The 3x 20kL Platin XXL tanks were dispatched from Graf's Perth Factory fo r delivery directly to site. Within a couple of hours the tanks had arrived and been lifted into the prepared shallow excavation, with the plumbing and backfilling completed th e following day. The flexibility of having multiple interconnection points on every side o f these tanks, and option to select to have them drilled out and prefitted with DN150 lip seals in the factory, made th e interconnecting pipework installation on the site even quicker. The Solution The Benefits Tanks held in stock; delivered to site and installed within 2 days fro m order. Trafficable Class D covers for commercial car park loadings. Option to chose which interconnection points to be drille d out and fitted with lip seals prior to factory dispatch “Within a couple of hours the tanks had arrived and been lifted into the prepared shallow excavation, with the plumbing and backfilling completed the following day.”

Project Gallery

Planning something similar?

Truck Centre, WA Forestfield