Inditex Logistics Centre - Malpica, Zaragoza, Spain
GRAF Group Reference: SUDS infiltration with EcoBloc Maxx and Maxx K for a nearly 286,000 m² logistics centre, more than 5,000 m³ storage across about 25,000 modules in 30 tanks.
Inditex logistics centre (Malpica) · Parque Industrial de Malpica, Zaragoza, Spain
GRAF Group Reference. International project adapted from GRAF Group published materials. Not an Australian install. Confirm republication rights before heavy promotion. View original source.
Project photos available from GRAF Group; local image rights not confirmed for this draft.
>5,000 m³
Infiltration storage
~25,000
EcoBloc modules
30
Infiltration tanks
Project data
- Location
- Parque Industrial de Malpica, Zaragoza, Spain
- Region
- Europe
- Sector
- Industrial
- Solution
- Infiltration
- Product
- EcoBloc Maxx / EcoBloc Maxx K
- Source
- GRAF Group Reference
- Purpose
- SUDS infiltration
- Volume
- >5,000 m³
- Modules
- ~25,000 EcoBloc Maxx
- Tanks
- 30 infiltration tanks
- Access
- Vario 800 Flex shafts
- Catchment / site
- Nearly 286,000 m² logistics centre
- Notes
- Adapted from GRAF Group published materials. Confirm republication rights before heavy promotion.
Challenge
A new logistics centre in Zaragoza with almost 286,000 m² of highly impermeable area needed onsite SUDS infiltration that cut peak flows in intense rain, avoided conflicts with underground services under the buildings, and fitted available underground space.
Solution
GRAF Ibérica delivered EcoBloc Maxx infiltration across 30 tanks made from nearly 25,000 EcoBloc Maxx modules, exceeding 5,000 m³ total storage. Each structure uses Vario 800 Flex shafts for hydraulic connections into the drainage network.
Outcomes
- More than 5,000 m³ onsite SUDS infiltration storage
- About 25,000 modules across 30 segmented tanks
- Industrial load capacity cited up to 40 tonnes with deep install capability