GRAF Group Reference: 50 m³ EcoBloc Maxx stormwater retention in two tanks, installed in two days to reduce ponding on community land at FRIM.

Forest Research Institute of Malaysia (FRIM) · Forest Research Institute of Malaysia (FRIM), Selangor, Malaysia

GRAF Group Reference. International project adapted from GRAF Group published materials. Not an Australian install. Confirm republication rights before heavy promotion. View original source.

Project photos available from GRAF Group; local image rights not confirmed for this draft.

50 m³

Retention volume

2 tanks

25 m³ each

2 days

Install time

Project data

Location
Forest Research Institute of Malaysia (FRIM), Selangor, Malaysia
Region
Asia
Sector
Municipal
Solution
Stormwater detention/retention
Product
EcoBloc Maxx
Source
GRAF Group Reference
Purpose
Stormwater retention / flood and ponding control
Volume
50 m³ (2 × 25 m³)
Dimensions
8.8 m × 4 m × 0.75 m - 2 tanks
Install
Two days
Category
Community land
Notes
Adapted from GRAF Group published materials. Confirm republication rights before heavy promotion.
01

Challenge

FRIM needed to tackle flooding and water ponding on community land while reclaiming usable surface space, without a long concrete-tank programme.

02

Solution

GRAF installed 50 m³ of EcoBloc Maxx as two tanks (published dimensions 8.8 m × 4 m × 0.75 m overall for the pair) in two days. The page cites 100% recycled plastic construction, 40-tonne load-bearing capacity, and CO₂ savings versus concrete tanks.

03

Outcomes

  • 50 m³ modular retention installed in two days
  • Two-tank layout for community land protection
  • Published 40-tonne load-bearing capacity

Planning something similar?