Pump station commissioning
Prove pumps, levels, sequences and alarms before handover on commercial GRAF | LIFT packages.
In short
Pump station commissioning verifies that pumps, level controls, alarms and panel sequences operate as designed, then hands the asset to operators with a report. GRAF | CARE provides this pathway for commercial pumping and water-system packages. GRAF | LIFT, PRESS, REUSE and CARE are being rolled out Australia-wide excluding Victoria. Project delivery, commissioning and field attendance are confirmed against location and scope.
How it works
What to do next
- 01
Complete install prerequisites
Power, pipework, wet well, panel connections and safe access ready.
- 02
Book CARE commissioning
Confirm location, scope and whether BMS or telemetry checks are included.
- 03
Handover with report
Operators receive demonstrated sequences and a commissioning report.
Checks that belong in commissioning
Pre-commissioning checks, pump rotation and run checks, float and level setup, instrument verification, sequence testing, alarm testing, control-panel checks, and BMS or telemetry checks where included in the package.
For duty/standby stations, prove alternation and backup starts. A single successful pump run is not enough.

Operator handover and report
Handover covers how the station starts, stops, alarms and what to do on high level or pump fault. The commissioning report records what was tested and any outstanding items.
After handover, planned maintenance under GRAF | CARE keeps the station serviceable through its operating life.

Compare options
Keep commission, maintain and renew as distinct CARE pathways.
| Pathway | Timing | Primary outcome |
|---|---|---|
| Commission | New or reconfigured asset | Proved sequences + handover |
| Maintain | Operating life | Condition report + actions |
| Repair | After a fault | Restore operation |
| Renew | End of life / upgrade | Refurbish or replace plan |
From Australian projects



Specify these products
Frequently asked questions
What is included in pump station commissioning?+
When should commissioning be planned?+
Who performs GRAF | CARE commissioning?+
What should be ready before attendance?+
Does commissioning include operator training?+
Need commissioning support?
Confirm site readiness and location. Call 1300 131 971 or use the quote form.